An essential function available in eRouting is transferring finished goods into stores at the end of the job.  When the transfer is made eRouting does a number of house keeping tasks beyond calculating the unit cost and adding parts in inventory.

* When updating template operation and cycle times, eRouting sets the estimated set-up time to the average of the actual set-up time from each time a part has been run.  When updating the operation, eRouting doesn’t change the cycle time, but rather averages out the actual cycle time from each run of the part and then adjusts the efficiency percentage and manned percentages accordingly.  This gives you a better grasp of your profitability and improved time estimates for scheduling in the future.

  • Compiles all associated C of Cs into a single PDF cert pack and saves on the server

  • Ensures that all operation and material requirements have been completed

  • Displays any un-invoiced material or outside processing, so a cost can be entered against them

  • Updates the job template, when existing, with any red-lined changes. (optional)

  • Updates all job operation estimated cycle times and set-up times (optional)*

For a demonstration or quote, please contact Tom Edge at tom@edge-mfgsoft.com